Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Arrangement configuration

Status
Not open for further replies.

Agriego

Mechanical
Joined
Nov 7, 2003
Messages
85
Location
US
I have a water tank assembly that uses an arrangement, but I'm having an issue with it.

The tank lid sub-assy has a elbow fitting that swivels. I created several arrangements to have the elbow fitting pointing in several directions. The tank lid sub-assy then goes into the tank assy. The problem is that the tank is used in several different units and if I change the arrangement in one unit, then it will be like that in the others. Is there a way to set up the arrangement and not not have to change it whenever I open the unit?

Thanks!

Al
 
BTW, I'm using NX 7.0.1.7 & Teamcenter Express on Windows 7.

Thanks again!

Al
 
Arrangements are assembly specific, which means that it will always revert to the default and must be specifically set in each Assembly where that sub-assembly is used. In other words, it's NOT the sub-assembly which remembers which Arrangement to use, but rather the next level-up Assembly, where the sub-assembly is being used, this is where you make the selection as to which Arrangement you wish to see in effect. That information is then stored in that top-level assembly.

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.
 
You can also "overide position" from your main assembly...
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top