jheidt2543
Civil/Environmental
- Sep 23, 2001
- 1,469
Could someone review this paragraph in ASCE7-02 and explain what they are trying to tell me? My confusion is with the "factor" in the last sentence, (20s)/20. To me that equals "s", but then what? Do you divide it into or subtract it from something???
The problem I am looking into is putting a new, taller addition next to an existing, lower roof building. What spacing is needed to ensure no snow drift load on the lower roof? In the old State of Wisconsin Building Code (I think it was adopted from the Canadian Code) they used a dimension of 15'. I want to design the new addition roof with a step in it, so the new roof adjacent to the existing roof is at the same elevation for a distance equal to "s" and then step up to full height.
The problem I am looking into is putting a new, taller addition next to an existing, lower roof building. What spacing is needed to ensure no snow drift load on the lower roof? In the old State of Wisconsin Building Code (I think it was adopted from the Canadian Code) they used a dimension of 15'. I want to design the new addition roof with a step in it, so the new roof adjacent to the existing roof is at the same elevation for a distance equal to "s" and then step up to full height.