Hi guys,
Probably someone here has expertise on API Q1.
I have one question that still confusing me at long time after i read section 5.4.5 API Q1 of Ninth Edition.
At this section mentioned Design verification & Final Review, "to ensure that the design and development outputs have met the design and development input requirements, design and development verification and a final review shall be conducted and documented"
what i confuse is the term is separated by "and", verification and final review, does it mean this section explaining there is two thing need to do ? not one ? due as in my first comprehension this section asked us to do only 1 thing, just design verification, comparing requirement in plan with our design in output, no more.
If yes, verification and final review is two different things, then what is the difference ?
Highly appreciated to someone that may give me an enlightenment about this.
Regards,
Rizky
Probably someone here has expertise on API Q1.
I have one question that still confusing me at long time after i read section 5.4.5 API Q1 of Ninth Edition.
At this section mentioned Design verification & Final Review, "to ensure that the design and development outputs have met the design and development input requirements, design and development verification and a final review shall be conducted and documented"
what i confuse is the term is separated by "and", verification and final review, does it mean this section explaining there is two thing need to do ? not one ? due as in my first comprehension this section asked us to do only 1 thing, just design verification, comparing requirement in plan with our design in output, no more.
If yes, verification and final review is two different things, then what is the difference ?
Highly appreciated to someone that may give me an enlightenment about this.
Regards,
Rizky