Mesopelagic
Electrical
- Jun 13, 2013
- 3
Good Day All,
This has been touched on in some old posts, but I think I have a bit of a different question. I will be designing some heat exchangers (shell and tube, steam on shell side) for some work in Brazil. My hope is that if I get the heat exchangers designed per ASME Section VIII Div 1, it will simply be a matter of paperwork with a Brazilian engineering firm to get the NR-13 requirements completed. Two questions I guess...
1. Does ASME translate into NR-13 easily
2. Does the NR-13 certification have to be done prior to shipment of the equipment into Brazil (we will be shipping from the USA) or can it be done while the equipment is being installed prior to startup?
Thank you for your thoughts.
-Meso
This has been touched on in some old posts, but I think I have a bit of a different question. I will be designing some heat exchangers (shell and tube, steam on shell side) for some work in Brazil. My hope is that if I get the heat exchangers designed per ASME Section VIII Div 1, it will simply be a matter of paperwork with a Brazilian engineering firm to get the NR-13 requirements completed. Two questions I guess...
1. Does ASME translate into NR-13 easily
2. Does the NR-13 certification have to be done prior to shipment of the equipment into Brazil (we will be shipping from the USA) or can it be done while the equipment is being installed prior to startup?
Thank you for your thoughts.
-Meso