Hello,

There is a center tubesheet, welded to shell on both sides.

Per ASME VIII-1, what would be requirement for the "tp" value in this case?
See below sketch.
tp1_hfqdpt.png




Would ASME VIII-1 consider just the center part of the tubesheet as "tp" (same OD as shell), or is it safe to consider that "tp" actually starts from the other face of the tubesheet and ends at the weld the other side.

Thanks
 
Replies continue below

Recommended for you

jakov11000, for tubesheets integral with cylinders I have always taken "tp" to be the (nominal)distance between welds. It is the unwelded land.

Regards,

Mike

The problem with sloppy work is that the supply FAR EXCEEDS the demand
 
tp = minimum distance from outside surface of flat head
to edge of weld preparation measured as shown in Figure UW-13.2
 