Hello everyone,
I'm on a project where the interior pavements are 6 inch slabs with a 8 inch base layer, and the exterior pavement is 3 inch asphalt with an 8 base layer and no subbase. Subgrade is pretty good (CBR >20%). The project is private and the biggest load will be occasional service trucks. I'm only worried about the transition between this pavements, as in one place they must be aligned and I worry that if not properly compacted the asphalt will deform more than the concrete and the joint will not be very smooth. I used to have a drainage channel with a steel grate to sort of help yet it was removed. What is the joint details that has worked for you in similar situations? I have seen a lot of details on the streets with some problems.
Kind regards.
I'm on a project where the interior pavements are 6 inch slabs with a 8 inch base layer, and the exterior pavement is 3 inch asphalt with an 8 base layer and no subbase. Subgrade is pretty good (CBR >20%). The project is private and the biggest load will be occasional service trucks. I'm only worried about the transition between this pavements, as in one place they must be aligned and I worry that if not properly compacted the asphalt will deform more than the concrete and the joint will not be very smooth. I used to have a drainage channel with a steel grate to sort of help yet it was removed. What is the joint details that has worked for you in similar situations? I have seen a lot of details on the streets with some problems.
Kind regards.