rxpartha
Mechanical
- Apr 6, 2005
- 34
Version : Pro/E 2001
Say I have a big assembly with many sub-assemblies. I by mistake assemble components to the main final assembly, but it is supposed to be in a lower level assembly (sub-assembly of the same big assembly). So is there any way in Pro/E by which I can transfer all the components from the highest level (main complete assembly) to the lower level of same main assembly after being assembled. Expecting some inputs.... thanks, Raj.
Say I have a big assembly with many sub-assemblies. I by mistake assemble components to the main final assembly, but it is supposed to be in a lower level assembly (sub-assembly of the same big assembly). So is there any way in Pro/E by which I can transfer all the components from the highest level (main complete assembly) to the lower level of same main assembly after being assembled. Expecting some inputs.... thanks, Raj.