ClarksonEng
Structural
I'm looking to put in a footing or pier for an equipment support. Loads are very small (about 2k axial, 3 k*ft moment). I've got some old boring logs and the area I'd like to put the footer is in miscellaneous fill. I was hoping to use a 5'x5' (or smaller) footing or 3' pier setting at about 5' below grade. Does anyone have any recommendations on a bearing capacity? The consultant assumed 500 psf, which seams too conservative and leads to a much larger footing than is construct-able due to nearby utilities and risk of undermining nearby foundations during construction. Piles are also out of the question here due to lack of ability to get equipment to this area.