Jan 21, 2011 #1 drawoh Mechanical Oct 1, 2002 8,860 CA As per ASME Y14.5M-1994, Figure_4.23, I am trying to attach my datum box to a broken line. I am still on SW2007 SP5.0 here. Has anyone figure this out? Can later versions of SolidWorks do this? JHG
As per ASME Y14.5M-1994, Figure_4.23, I am trying to attach my datum box to a broken line. I am still on SW2007 SP5.0 here. Has anyone figure this out? Can later versions of SolidWorks do this? JHG