Good morning,
I am looking through project's scope of work and it says the removal and re-installation of thermocouples.
We are going to install a new secondary superheater ( 2 headers and 90 new elements ) and I was wondering how the thermocouples are normally attached and what type of NDE would be required for them ? It is my understanding that they are normally fillet/tack welded on to the tubes. I requirements in ASME Sec.1 in the PWHT section under P5A and it mentions capacitor discharge welding or electric resistance welding. I have never seen either of those processes performed before. Are there alternate NDE requirements / PWHT if you use SMAW or GTAW to weld them on ? It sounds like I need to get the design and location of these TC's from the engineer.
I am looking through project's scope of work and it says the removal and re-installation of thermocouples.
We are going to install a new secondary superheater ( 2 headers and 90 new elements ) and I was wondering how the thermocouples are normally attached and what type of NDE would be required for them ? It is my understanding that they are normally fillet/tack welded on to the tubes. I requirements in ASME Sec.1 in the PWHT section under P5A and it mentions capacitor discharge welding or electric resistance welding. I have never seen either of those processes performed before. Are there alternate NDE requirements / PWHT if you use SMAW or GTAW to weld them on ? It sounds like I need to get the design and location of these TC's from the engineer.