Avoid fresh concrete "amassing"?

Status
Not open for further replies.

drile007

Structural
Jul 14, 2007
194
At which [α] angle we don’t need “upper” formwork to avoid fresh concrete “amassing”?

my.php


Thanx in advance

PS: Hope amassing is the proper word which describe the problem.
 
Replies continue below

Recommended for you

It depends very much on the slump. Also many other factors, such as mix design, aggregate gradation, w/c ratio, admixes, 'age' of concrete, ie: what point is the hydration reacytion at? Keep in mind that stiff concrete is not easy to work with.
 