drile007
Structural
- Jul 14, 2007
- 194
At which [α] angle we don’t need “upper” formwork to avoid fresh concrete “amassing”?
Thanx in advance
PS: Hope amassing is the proper word which describe the problem.
Thanx in advance
PS: Hope amassing is the proper word which describe the problem.