I have an underground detention system consisting of twin barrells of 60" pipe with a concrete outlet structure. I have sized an 18" RCP outlet pipe to carry flows to a downstream storm drain. I have been asked to calculate the 100-yr hydraulic grade lines for the pond tailwater elevations. Any advice would be most appreciated.