maddocks
Petroleum
- Aug 21, 2001
- 343
I am installing a 750 HP steam boiler into an existing facility. All piping appears to be contructed to B31.3. If I continue with this, will I be in compliance with B31.1?
Jim Maddocks, P.Eng.
V.P. Engineering
jmaddocks@gasliquids.com
403-250-2950
Jim Maddocks, P.Eng.
V.P. Engineering
jmaddocks@gasliquids.com
403-250-2950