Hey there, I was hoping to get a response in regards to battery bank testing and maintenance for DC supply in a Substation, switch yard. Many years my company has done impedance and ripple current testing annually and a discharge testing about every five years. When completing impedance testing and verifying voltage reads from every cell within that bank, if the cells are out of range (lowest to highest) 5% of each other we are given the go ahead to do an equalize charge for whatever the manufacturer specify's (48 hours normally). After said charge and a day later, we go back and check individual cell voltages. Most of the time the cells voltages are about the same, but within a month they are back to being + - 1.5% to 2.5% differing in cell voltage, 2.17vdc cell could be as low as 2.11 or high as 2.23 or higher. I am to the point where I think, if we aren't doing discharge testing every year, that turning the AC charger off for a discernible amount of time would really be exercising all the cells equally, in theory, essentially. If we have a bad cell it would be distinguishable when turning the charger back on. I am thinking preventative maintenance but the employer believes otherwise. Just want some feedback on what other people are doing with their battery banks. Thanks in advance
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor