Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

BB DIFF. PROTECTION SCHEM

Status
Not open for further replies.

msasd2020

Electrical
Nov 12, 2015
6
AS PER THE ATTACHE FILE AND BB PROTECTION SCHEME HIGH IMPEDANCE (MFAC) THE CT SWITCHING CIRCUIT GOT DELAY WHEN THE BUS SECTION BREAKER TRIPPED OR OPENED MANUALLY SO I REMOVE THE GREEN LINE TO DISABLE THE SWITCHING OF THE CT CIRCUIT(TEMPORARY) SO WHAT CAN I DO TO SOLVE THIS PROBLEM TO AVOID THE UNNECESSARY TRIPPING
 
 http://files.engineering.com/getfile.aspx?folder=adc9bf3d-40c1-4006-8882-3f574ec4feca&file=IMG_20151104_131235.jpg
Replies continue below

Recommended for you

It's a bit difficult to figure out your scheme and the problem with your description and the portion of the drawing you provided. Do you have a one-line diagram? What do you mean by "remove the green line"?
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor