jpier99463
Civil/Environmental
- Oct 24, 2009
- 7
I am building a stone and mortar perimeter wall around a military base. All of the mortar is testing good at 7 days as I wait for the 28 day results. That is except for the first days mortar where the strenth is 500psi at 7 days vs 900-1100 psi at seven days for subsequent day's samples. The section of wall where the mortar was used is obviously at the bottom of the place where we began constructing the wall. Specs call for 1850 psi at 28 days. Won't make it with the first day's mortar cubes. How do you test in-place mortar in the stone wall to see if it eventually achieves design strength? Can you core drill into such a wall? Should I hold my final mortar cube til 45 days to then test and verify if it reaches strength. I'm certainly open to suggestions.