ollylandandwater
Civil/Environmental
- Jun 22, 2006
- 25
I have been asked to provide a method of providing a bench mark AOD on a site, that is about 2 miles from anything that could be used as a level datum and the site is surrounded by undulating terrain and thick woods! Is there an easy way of setting up this bench mark without using a dumpy level / total station to transfer the level over the 2 miles?