I have an existing medium-rise building with a one level basement. This building is founded on bedrock just below the basement slab.
The owner wants to put a new structure right next to the existing, with a two level basement.
Now, this will require the removal of bedrock, wether by blasting or chipping. I think that this rock removal will fracture the bedrock under the existing building, possibly causing undermining the foundation. I want to have the owner pull his new structure away from existing X amount of feet.
Does anyone know of any problems associated with removing bedrock 13' down from face of existing structure founded on rock? And what is a safe distance to move the new rock cut away from existing structure?
The owner wants to put a new structure right next to the existing, with a two level basement.
Now, this will require the removal of bedrock, wether by blasting or chipping. I think that this rock removal will fracture the bedrock under the existing building, possibly causing undermining the foundation. I want to have the owner pull his new structure away from existing X amount of feet.
Does anyone know of any problems associated with removing bedrock 13' down from face of existing structure founded on rock? And what is a safe distance to move the new rock cut away from existing structure?