kepharda
Mechanical
- Mar 8, 2006
- 81
I have a client who is going to blend biodiesel into ULSD at the Pipeline. They want to blend to make B5 and send it along the pipeline.
I am not totally responsible for the design of this area, however, I am designing the pumps/piping up to the pipeline tie in. So far I have zero information about the equipment/conditions that will be at the pipeline and I am starting to feel like they don't know what they will be doing.
Can anyone give me an idea of the equipment necessary to do the job and any special attachment methods required?
I appreciate the help in advance.
this message has been approved for citizen to elect kepharda 2008
I am not totally responsible for the design of this area, however, I am designing the pumps/piping up to the pipeline tie in. So far I have zero information about the equipment/conditions that will be at the pipeline and I am starting to feel like they don't know what they will be doing.
Can anyone give me an idea of the equipment necessary to do the job and any special attachment methods required?
I appreciate the help in advance.
this message has been approved for citizen to elect kepharda 2008