After a false trip on a scheme like that, we moved the instantaneous ground overcurrent setting up above the largest possible ground current due to one or two poles open. That project was a good example of how using every available element when upgrading from electro-mechanical relays to microprocessor based relays can lead to new types of incorrect trips. Also be sure any negative sequence elements are secure during GOAB.