Hello,
does anyone know how much is the minimum required points that should be connected from the following units to the BMS:
1) chiller
2) AHU
3) FCU
4) Fan
5) Pressurizing fan
6) VAV with reheat coil
7) VAV without reheat
8) Pumps (secondary chilled water circuit)
does anyone know how much is the minimum required points that should be connected from the following units to the BMS:
1) chiller
2) AHU
3) FCU
4) Fan
5) Pressurizing fan
6) VAV with reheat coil
7) VAV without reheat