pdybeck
Mechanical
- May 14, 2003
- 599
Does anyone have any experience working with the new BOM and any information as to why the order tends to jump around? It is killing us currently. We need to use the new BOM to do a configurable Bill because our assembly has different configurations where parts are suppressed or unsupressed depending on whether they exist in that top level. I like the capabilities that the new BOM has to do this, however it seems to have a mind of its own when we try to get the parts ordered in the sequence we desire. With a configurable BOM, it seems impossible to get it to follow the assembly order, unless we manipulate the order under BOM contents. We also group certain items together under the new BOM contents capabilities. Next we lock the BOM to keep the order from changing, but as soon as we unlock the BOM to incorporate a change, the order gets destroyed and we have to do everything all over again. This is a pain for ECN or ER's as everytime th eBOM is unlocked to make a change, the order needs to be re-created. Is there something we are missing or are not doing correct here? I'm not ranting about the weird behaviors of the new BOM, I'm just checking to make sure we are not doing anything contrary to what it is designed to do (or intended).