cap4000
Civil/Environmental
- Sep 21, 2003
- 555
I have a soldier pile wall to design in clay then massive bedrock below. Has anyone ever used the Stabilty Number Method to determine temporary lagging wall or HPile pressures for an 8 foot soil cut?? Thanks in Advance.