While prestressing in a Prestressed Concerete box girder @ 70m span ( @230 ft), one of the cables slipped, and the plate at the anchorage ruptured.This resulted in the cable end going into the box girder. There is sufficient amount of stress in the cable. Is there a solution to release this stress so that no future accident will occur.