I'm sure this has probably been discussed before, but I can't find it. What are the pros and cons of AASHTO pre-cast girder bridge vs box beam bridge vs superbox culvert "bridge"
 
Replies continue below

Recommended for you

ok, I'll start and assuming very little skew and no horizontal curvature and assuming relatively short overall span, perhaps a few hundred feet...

AASHTO pre-cast girders are
easier to design
shorter span lengths
taller supperstucture / higher overall bridge profile
faster to construct
cheaper

boxed beam bridge
harder to design
longer span lengths
narrower superstructure / lower bridge profile
takes longer to fabricate
more expensive

superbox culvert
less hydraulic capacity than a true bridge
lowest overall profile
more impact on riverbed


 
AASHTO pre-cast girders
+ allow easier deck forming system ~ PCP's or PMD's
allow less work on-site than forming Bridge class box culvert
- more $ goes to supplier instead of the contractor and local economy

box beam bridge
+ faster construction on-site
- more $
- normal lengths are 100 LF and less

Bridge class culvert
+ more $ to be made (or lost) by the contractor on-site and the local economy
(takes the supplier out of the equation)
- takes considerably longer to construct (in most cases)
- seasonal and more weather dependant
 
if I go from 6 span AASHTO Type 4 at approx 100 ft per span (600 foot total length) to 5 span AASHTO Type 6 with 120 ft span I am saving a lot of money on a proposed bridge. Anybody want to venture a guess how much?
 
cvg


Off the top of my head with no verification.

The type 6's we have seen... utilized inverted-T (interior) caps...so the cap(s) are more $.
The 6's obviously cost more. (than 4's)
Eliminating a span (8?) of beams, as well as a bent of foundations, columns, and cap.

A little more labor utilizing the 6's.
They are significantly more unstable.
Bracing will be a little more.

Assuming the design for the foundations, columns, and caps would change a little...appears that it would be cheaper to go with the Type VI Design.

So ...... how much cheaper?
 
104' wide bridge with superelevation

would be eliminating 1 set of drilled shafts, pier caps, piers and approximately 18 girders.

Circular/multi-column piers with dropped-type pier caps or hammerhead piers are recommended at the pier locations. Inverted tee pier caps can be used; however this type of pier cap was not recommended due to increased cost. drilled shafts are the recommended foundation type.
 
thats my question
 
I am looking for some help on assessment of post tensioned box beam bridge.I have modelled it as a 2D Grillage.How can i analysis the web & diaphragm stressess in it?

Any help will be appreciated.
 