allanex50
Civil/Environmental
- Dec 3, 2011
- 8
Proposed 4-story Building is supported by isolated footing rest on Bored Piles. A newly concrete footing was found to be inadequate due to low strength test results, so the consultant decided to remove the concrete. However, our project manager refused to do so, instead, he proposes to remove only portion of the concrete that seems weak which is located 1/3 of the thickness upper part of footing to keep lower part remain. Then using special cementious material and adhesive chemical and fill up concrete up to the required level. My question is, Does it satisfy to rectify the structural integrity of the footing? Please, any expert on this to give your opinion is highly appreciated.Thanks a lot.