scotton
Structural
- Mar 29, 2007
- 4
What is the rationale regarding the building period limitation in reference to any building code (i.e. ASCE 7-95 eq. 9.2.3.3.1-1 times Cu from table 9.2.3.3, ASCE 7-98 eq. 9.5.3.3-1 times Cu from table 9.5.3.3, UBC 97 Method B can only be 30% to 40% greater than eq. 30-8 depending on the seismic zone). Part b of my question is how does this relate (if there is any relationship) to high-rise structure? Thanks