Hi, Professionals
I am currently searching for building structural design fees and am focusing on practices in the United States. However, finding accurate and detailed information has been quite challenging. During my search, I came across the ENG-tips platform and noticed that it is a hub for active communication among engineering professionals. I would greatly appreciate your insights on this topic.
From my understanding, structural design fees in the U.S. are not standardized or regulated, and costs are generally determined through low-bid systems, shaped by market dynamics. However, I would like to better understand the typical fee levels. Could you kindly share any information or experiences regarding the following, particularly in relation to project size (construction cost, area, floors, design complexity etc)?
Thank you in advance for your valuable input!
All the best in the new year!!
I am currently searching for building structural design fees and am focusing on practices in the United States. However, finding accurate and detailed information has been quite challenging. During my search, I came across the ENG-tips platform and noticed that it is a hub for active communication among engineering professionals. I would greatly appreciate your insights on this topic.
From my understanding, structural design fees in the U.S. are not standardized or regulated, and costs are generally determined through low-bid systems, shaped by market dynamics. However, I would like to better understand the typical fee levels. Could you kindly share any information or experiences regarding the following, particularly in relation to project size (construction cost, area, floors, design complexity etc)?
- Structural Design Fees
- Costs for calculations, analysis, etc.
- ($ per sq ft?) or (% of construction cost?) or ($ per project?)
- Structural Drawing Fees
- Costs associated with preparing structural drawings.
- ($ per sq ft?) or (% of construction cost?) or ($ per project?)
- Structural Review and Stamping Fees
- Fees for reviewing and stamping structural plans.
- ($ per sq ft?) or (% of construction cost?) or ($ per project?)
- (man-hours per sq ft) Estimation
- Are there any commonly used methods for estimating the (man-hours per sq ft) required for these tasks?
Thank you in advance for your valuable input!
All the best in the new year!!