00Z
Structural
- Nov 21, 2010
- 45
I have a built up beam made out of a 2x10 sandwiched between to sheet of 3/4" plywood, and I have a couple of questions.
First I don't have the NDS supplement to get the fb and fv values for plywood but I think that they should be higher than DF#2 so I was going to just assume the DF values. Anyone opinion on this assumption?
Second when calculating out my shear flow to determine nail spacing I'm getting really high values. I'm using the equation f=VQ/I. In determining I=bh3/12 I am using a h=4.625" instead of 9.25" is that incorrect.
The plywood is stitch nailed with 4 rows of nails. So I have 2 nails above the neutral axis. In determining Q=yA, I am using y = 4.625"/2 (distance from N.A. to center of two nails) and A = 1.5" x 9.25"/2. Do I have to calculated out for each row of nails or can I do it as a group.
I know this is a lot to ask, especially for a first post but would appreciate any input. I have been a long time lurker and have found the site to be very informative.
Thanks.
First I don't have the NDS supplement to get the fb and fv values for plywood but I think that they should be higher than DF#2 so I was going to just assume the DF values. Anyone opinion on this assumption?
Second when calculating out my shear flow to determine nail spacing I'm getting really high values. I'm using the equation f=VQ/I. In determining I=bh3/12 I am using a h=4.625" instead of 9.25" is that incorrect.
The plywood is stitch nailed with 4 rows of nails. So I have 2 nails above the neutral axis. In determining Q=yA, I am using y = 4.625"/2 (distance from N.A. to center of two nails) and A = 1.5" x 9.25"/2. Do I have to calculated out for each row of nails or can I do it as a group.
I know this is a lot to ask, especially for a first post but would appreciate any input. I have been a long time lurker and have found the site to be very informative.
Thanks.