I'm doing a project wich required me to calculate the transfer rate of Barite & Cement from tanks to tanks. I've run couple of calculation but i'm not sure it is the correct one or not.
the detail is as follow;
Pipe size = 5" / lenght of pipe (approx. 100 ft)
eductor = 1" c/w fluffer vlv
acfm = 631 @ 7 bar
but the most tricky part is the requirement of transfer rate is =80 ton /hr.
the detail is as follow;
Pipe size = 5" / lenght of pipe (approx. 100 ft)
eductor = 1" c/w fluffer vlv
acfm = 631 @ 7 bar