Bulk Transfer

Status
Not open for further replies.

siiruy

Marine/Ocean
May 17, 2009
9
I'm doing a project wich required me to calculate the transfer rate of Barite & Cement from tanks to tanks. I've run couple of calculation but i'm not sure it is the correct one or not.

the detail is as follow;
Pipe size = 5" / lenght of pipe (approx. 100 ft)
eductor = 1" c/w fluffer vlv
acfm = 631 @ 7 bar

but the most tricky part is the requirement of transfer rate is =80 ton /hr.
 