Hi every specialist;
I'm reading ASME B16.9 code and I found in paragraph 9 ''Design Proof Test'' this statement: ''Proof test shall be made when the manufacturer chooses proof testing to qualify the fitting design’’.
That means Manufacturer can choose another method to qualify the design of standardized fittings.
1) Can somebody explain what can be these alternative methods for qualifying the fitting design?
2) Being a client, can we oblige the manufacturer to apply only proof tests not alternative method?
Many thanks
I'm reading ASME B16.9 code and I found in paragraph 9 ''Design Proof Test'' this statement: ''Proof test shall be made when the manufacturer chooses proof testing to qualify the fitting design’’.
That means Manufacturer can choose another method to qualify the design of standardized fittings.
1) Can somebody explain what can be these alternative methods for qualifying the fitting design?
2) Being a client, can we oblige the manufacturer to apply only proof tests not alternative method?
Many thanks