MountHorn
Petroleum
- Jul 29, 2023
- 6
In years past, the facility had to shut-in to perform inspections on the dry oil tank. However, we are trying to find ways to bypass the DOT so we do not stop production. What criteria must be considered when evaluating if the DOT can be bypassed (ie. RVP, dew point, etc.) There is a bulk oil treater/degasser upstream and booster LACT pumps on the discharge. We also have a test FWKO/separator and production FWKO/separator.