elowami
Chemical
- May 18, 2016
- 28
in our company we have a problem in the C3 hydrogenation reactor run lengths.
the operation of the reactor is poor, run lengths of 20 days being experienced instead of the design period of 120 days.
Thanks for your participation.
the operation of the reactor is poor, run lengths of 20 days being experienced instead of the design period of 120 days.
Thanks for your participation.