foglights
Military
- Oct 29, 2008
- 18
I cannot find any reference to allowable contact of a 1/16" 7X7 steel cable running through a vertical ring lightening hole on a composite fairlead designed to be installed around the lightening hole as protection for the cable.
I realize that in most situations the cable runs fore to aft with no contact to surrounding structures. In this situation the cable runs through 99% of its length with no contact on any structures it passes through or by. However, in the area in question the cable passes through and contacts the composite fairlead by 'resting lightly' on it. It is the only spot on the length of the cable where the composite block is installed which makes me believe its actually serving its purpose. But inspectors insist that no contact should be made anywhere.....but I am having trouble finding any reference on these inspection specifications.
I realize that in most situations the cable runs fore to aft with no contact to surrounding structures. In this situation the cable runs through 99% of its length with no contact on any structures it passes through or by. However, in the area in question the cable passes through and contacts the composite fairlead by 'resting lightly' on it. It is the only spot on the length of the cable where the composite block is installed which makes me believe its actually serving its purpose. But inspectors insist that no contact should be made anywhere.....but I am having trouble finding any reference on these inspection specifications.