i resently poured a caison can for a hammer head. we realized that our hoops were short by one run the contractor would like us to chip out the concrete and lap the splice and then continue. they want a 52 inch splice for a number 5 bar .being the concrete is at grade wouldntit be the same thing if i drilled and epoxyed the rebar and continue the lap for the caison