STR04
Structural
- Jun 16, 2005
- 187
At typical caisson foundation systems is necessary to provide a cap with grade beams framing into two directions similar to a pile fdn system? I'm trying to save money for a project and would like to design my foundation system like an elevated structural slab over concrete columns thus eliminating interior grade beams. I would then add column drops as required for punching shear and design the slab as a flat plate. What are everyone's thoughts?
TIA
TIA