fox88
Mechanical
- Nov 14, 2012
- 1
how much motor power (kW) required in cooling tower, if i have data in these following:
cooling capacity = 2 tons
sump basin capacity = 1.6 meter cubic
flowrate = 0,5 meter cubic per hour
cooling capacity = 2 tons
sump basin capacity = 1.6 meter cubic
flowrate = 0,5 meter cubic per hour