Civil/Environmental
Apr 4, 2016
1
Perhaps an easy question, but one that is vexing me. I am routing a flood down a reach using Muskingum-Cunge with an 8-point channel profile. Is there a way to get a calculated stage at the reach outlet? It seems like there should be, but heck if I can find it. Thanks!
 