- Oct 11, 2011
- 9
We are chipping concrete piles, as a result, cut concrete is more than 10 cm from the required level of pile head. Using non shrink grout without gravel is so expensive, so we need to add gravel because of extra thickness of concrete to repair. Can it be practical to add gravel? If so, what is the proportion of cement to gravel mix? Please any expert can give his opinion, is highly appreciated. tnx a lot.