KevinDeSmet
Computer
- Apr 29, 2008
- 302
I was wondering, suppose I had drawn out a single bundle segment over a substantial amount of route points. Now I decide I need a branch point to break it up, can I switch a single into a multi branchable document without having to restart from scratch?
Certified SolidWorks Professional
Certified SolidWorks Professional