ars001
Structural
- Aug 21, 2006
- 83
I've been requested to design a salt storage shed will a 10'-0" tall concrete retaining wall. The stucture sits on top of the retaining wall. The retaining wall shall resist the forces for the salt/sand material and also forces from equipment. Any ideas on what sort of lateral loads shall be used for the loaders loading the material? It has been suggested to design the walls with counterforts or buttresses. What are the advantages of butresses? With butresses the concrete wall is designed to span horizontally between butresses. Is this correct?
Thanks for the help.
Thanks for the help.