I'm doing some preliminary motor starting studies (fatal flaw analysis) for a centrifugal gas compressor addition. I'm using SKM for the modelling. We're proposing using a low inrush 12.5 kV synchronous motor. The methodology proposed (by my client) to start the motor and control utility flicker is similar to that which we've used previously on smaller machines at the site - using a capacitor to partially supply the VARS during starting.
The problem is, the options are to use a 25 or 30,000 HP motor. These require a 55 MVAR and 75MVAR capacitor bank to control flicker, switched on the 12 kV bus with the motor. (The cap bank is switched out when the motor comes up to speed). The ratio of the cap bank size is 2-3X the motor size here, which is a lot bigger than I've previously seen. The client is very insistent that this method be used. (I'm proposing a "pony motor" to spin it up to speed).
1) Are any of you aware of any objective standards or recommended practice guidelines which would give any guidance?
2) Other than doing an EMTP study (which we might do anyway) are there any other recommended practices to look at for capacitor switching?
I'm doing this for flicker control on the utility bus (115 kV). I'v checked other issues such as loading, added bus fault contribution, etc & all looks OK at this time.
Thanks
The problem is, the options are to use a 25 or 30,000 HP motor. These require a 55 MVAR and 75MVAR capacitor bank to control flicker, switched on the 12 kV bus with the motor. (The cap bank is switched out when the motor comes up to speed). The ratio of the cap bank size is 2-3X the motor size here, which is a lot bigger than I've previously seen. The client is very insistent that this method be used. (I'm proposing a "pony motor" to spin it up to speed).
1) Are any of you aware of any objective standards or recommended practice guidelines which would give any guidance?
2) Other than doing an EMTP study (which we might do anyway) are there any other recommended practices to look at for capacitor switching?
I'm doing this for flicker control on the utility bus (115 kV). I'v checked other issues such as loading, added bus fault contribution, etc & all looks OK at this time.
Thanks