To all;
I am seeking some help. I have designed out a small subdivision and placed my catch basins a part based on a past design requirement that I learned. Well, the local authority wants the CBs every 400 ft which seems a little far for my design application. I have been using the Federal standard but this guy seems to be nagging about this one little thing. I get the slopes alright but would like to know what everyone else uses.
Thanks in advance.
I am seeking some help. I have designed out a small subdivision and placed my catch basins a part based on a past design requirement that I learned. Well, the local authority wants the CBs every 400 ft which seems a little far for my design application. I have been using the Federal standard but this guy seems to be nagging about this one little thing. I get the slopes alright but would like to know what everyone else uses.