Galambos
Structural
- Jun 27, 2005
- 231
I primarily design buildings but I have a precaster client that would like to reduce the amount of reinforcing in his DOT catch basins by way of engineering design. I am curious if anyone has experience doing this or ideas for references. He would like a stamp certifying that the reduced reinforcing is adequate, despite having less reinforcing than depicted on the standard drawing. It seems to be a common practice, nowadays.
It doesnt appear to be directly addressed in the AASHTO Bridge Spec but comes close in the buried structures section.
Any ideas?
It doesnt appear to be directly addressed in the AASHTO Bridge Spec but comes close in the buried structures section.
Any ideas?