paipisan
Petroleum
- Jan 8, 2014
- 3
Dear All
During my recent CP Survey on Onshore facility, I found out the buried section of pipeline had almost reading to the above ground pipeline, differentiate only about 100-150mV. The facility is using ICCP System and monoblock is install between buried section of pipeline and above ground pipeline. Any idea how this may happened, as I suspected it was due to voltage leakage.
During my recent CP Survey on Onshore facility, I found out the buried section of pipeline had almost reading to the above ground pipeline, differentiate only about 100-150mV. The facility is using ICCP System and monoblock is install between buried section of pipeline and above ground pipeline. Any idea how this may happened, as I suspected it was due to voltage leakage.