jharm
Civil/Environmental
- Aug 28, 2007
- 7
We have made a recommendation for 3-5% cement treating of the uppermost 12-inches of soil to underly pavement on a newly constructed road. Local Agencies require we verify a CBR of 7 for the material. Hence, we'll be determining the m-d curves using ASTM D558. However, as I undertand it, it is nearly impossible to run a CBR on cement-treated material? Can it even be done for CT Soils in accordance with D1883, since curing is an issue? Is there another way to determine the CBR by making pills and breaking them using a compressive strength machine? TIA!