BronYrAur
Mechanical
- Nov 2, 2005
- 799
I have a few general questions that I would appreciate ideas on how to best answer. This is part of an RFP to perform central plant maintenance and operation for a hospital boiler/chiller/generator plant. I will list them below and would appreciate any suggestions:
How do you propose to provide for continuous improvement efforts to reduce cost while improving service and consistently achieving targets?
How would you propose structuring continuous improvement efforts?
How, specifically, do you propose to measure this improvement?
What specific problem identification and problem solving methodology do you use to eliminate the reoccurrence of unplanned downtime that result from equipment or system breakdowns?
What specific construction planning strategies do you use and how do you see those implemented to reduce life cycle cost of new facilities?
Thanks for the help.
How do you propose to provide for continuous improvement efforts to reduce cost while improving service and consistently achieving targets?
How would you propose structuring continuous improvement efforts?
How, specifically, do you propose to measure this improvement?
What specific problem identification and problem solving methodology do you use to eliminate the reoccurrence of unplanned downtime that result from equipment or system breakdowns?
What specific construction planning strategies do you use and how do you see those implemented to reduce life cycle cost of new facilities?
Thanks for the help.