ZtheFEAkilla
Structural
- Aug 24, 2007
- 1
Hey All,
I'm using ANSYS WB v11 structural lisence. I need to increase the number of iterations before bisection occurs in my non-linear analysis. Ansys default is 25. Using NEQIT command, the max I can make it is 26. It is on the brink of converging at iteration #26, I would very much like it to iterate a couple more times, perhaps 5 more times or so.
Any thoughts?
Thanks!
Z
Oh and this is my first post EVER so be easy on a noob!
I'm using ANSYS WB v11 structural lisence. I need to increase the number of iterations before bisection occurs in my non-linear analysis. Ansys default is 25. Using NEQIT command, the max I can make it is 26. It is on the brink of converging at iteration #26, I would very much like it to iterate a couple more times, perhaps 5 more times or so.
Any thoughts?
Thanks!
Z
Oh and this is my first post EVER so be easy on a noob!