VTeng
Civil/Environmental
- Oct 24, 2008
- 2
Hi,
I'm modeling check dams with two outlets, an overflow weir and exfiltration. I have a method for calculating flow rates through the dam, but I'm not sure how to set up the exfiltration so that the model recognizes it as only passing through the vertical face of the dam. Is this possible, or should I simply scrap the exfiltration?
Sorry if there is a simple solution for this, I'm fairly new.
Thanks
I'm modeling check dams with two outlets, an overflow weir and exfiltration. I have a method for calculating flow rates through the dam, but I'm not sure how to set up the exfiltration so that the model recognizes it as only passing through the vertical face of the dam. Is this possible, or should I simply scrap the exfiltration?
Sorry if there is a simple solution for this, I'm fairly new.
Thanks