emalsyd
Mechanical
- May 10, 2006
- 43
I need to design a Class B Operation Room. Supposed to have 20 ACH with 4 outdoor ACH, no recirculating room unit. I'm assuming by no recirculating room unit the unit needs to be 100% outdoor air. The 20 ACH with 4 OACH is throwing me off. If I'm 100% outdoor air wouldn't my outdoor ACH by the same as my supply air ACH?